For flood protection in the municipality of Baar-Ebenhausen, the compensatory measures and recultivation of the claimed construction site must be implemented in construction phase 2, lot 7, in the section between Geisenfelder Straße and Stockaustraße, on the right and left banks of the pair, between the flood protection walls and the banks (total length approx. 1,000 m). For this purpose, woody plants are planted in currently largely thinned stands or planted as a supplement to the riparian forest to restore a riverbed border.
Completion maintenance and development maintenance for two years are also advertised.
The following work is essentially to be carried out:
- Mowing the processing area of approx. 3,000 m2
- Collect and dispose of rubbish and debris on the areas
- Making and filling planting pits for individual plantings by Heistern 40 pcs.
- Loosening the working surface up to a depth of 30 cm on approx. 3,000 m2 by hand
- Planting of local trees (596 hours) as loose land planting adapted to the existing vegetation (spread over approx. 3,000 m2), single planting 40 hours and introduction of sticks (400 hours) into poured stone banks
- mulching with straw from the planting discs of the individual trees and the planting areas to approx. 3,000 m2 according to measurements
- Marking young plants and shrubs with tonkin sticks (329 pcs), anchoring the heister with stakes (320 pcs) and attaching wire pants around individual trees (40 pcs) as protection against biting
- One-year completion maintenance and two-year development maintenance of the planting, by mowing and watering, depending on the weather and in coordination with the client.