Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment | Tenderlake

Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 August 2019
Closing Date:
09 October 2019
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
ICN switch

With the ICN Modernization project, an Ethernet network will be installed in the vehicle along with other components.

The switches are interconnected as components of SBB to a managed 1 000 BaseT (GE) network and configured by the SBB. This wired network on the vehicle allows the connected components to communicate. The network supports functions such as zone separation via VLAN, QoS, SNMP management, security, ring redundancy, PoE and others.

SBB expects an offer for:

- Switch Layer 2 Number 528 pcs. / Optional 1 470 pcs,

- Switch Layer 3 Number 88 pcs. / Optional 72 pcs.

SBB can allocate the total quantity to one supplier or as partial quantities to different suppliers.

With the ICN Modernization project, an Ethernet network will be installed in the vehicle along with other components.

The switches are interconnected as components of SBB to a managed 1000BaseT (GE) network and configured by the SBB. This wired network on the vehicle allows the connected components to communicate. The network supports functions such as zone separation via VLAN, QoS, SNMP management, security, ring redundancy, PoE and others.

SBB expects an offer for:

- Switch Layer 2 Number 528 pcs. / Optional 1 470 pcs,

- Switch Layer 3 Number 88 pcs. / Optional 72 pcs.

SBB can allocate the total quantity to one supplier or as partial quantities to different suppliers.

Download full details as .pdf
The Buyer:
Schweizerische Bundesbahnen SBB Division Personenverkehr, P-O-AM-FSE-SE-EEL
CPV Code(s):
34630000 - Parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment