New office and laboratory building (GO IN II) in the Potsdam-Golm Science Park.
outdoor facilitiesConstruction site equipment, traffic safety:
- 106 m
- 550 m
- 2540 m
- 262 m drainage canal works up to DN 200 incl. Shafts;
- 91 m drainage channels up to DN150 / D400;
- 145 St. Rigolen-Füllkörper PP,
- 23 inspection and inspection shafts DN400 (PE / PP) up to DN 1 000 (concrete);
- 245 m
- 65 m
- 193 m full drain pipe DN / OD 200;
- 2,335 m
- 1,025 m
- 1 265 m
- 935 m concrete curbs RB 6/25 to HB 15/30;
- 16 pcs bicycle leaning brackets;
- 12 pieces of bench elements with overlay, partially backrest;
- 2 500 m
- 455 m
- 1,880 m
- 640 m
- Plant, anchor, maintain 30 trees (completion maintenance).
Manufacture fencing with gates, supply signage, equipment (bollards, wastebasket, ashtray), manufacture, barrier system with central island, supply operating columns, set up.