Lot 1.4 Replacement of FW GfK in KMR Boleslawiecer Straße and Meller Weg with house connections, civil engineering and pipeline construction.
Civil engineering services:
- Create 2 230 m³ of pipe trenches;
- Create 265 m³ of construction pits;
- Dispose of / deliver 2,495 m³ of soil;
- 4,930 m
- Demolish / restore 184 m³ asphalt pavement;
- 816 m
- Remove / install 2 street gullies;
- Remove / install 48 m drainage channel;
- make 25 pieces of tree protection;
- Delivery / installation of 121 street caps;
- Make 100 wall / floor penetrations;
- 23 m³ of demolition / dismantling of concrete; Traffic security;
Dismantling services:
- 120 m GfK-EP-KMR DN 80-200 and 232 m GfK-EP-KMR DN 25-50 supply and connection pipes including shut-off valves and molded parts in concrete abutments;
- 63 m steel pipe DN 25-80 including insulation as well as fittings and connecting pieces;
- 92 fittings up to DN 40 with wall brackets including professional disposal
Pipe construction services:
Delivery / laying / assembly of FW supply and connection lines:
- 20 m KMR DN 200;
- 31 m KMR DN 150;
- 604 m KMR DN 80;
- 684 m KMR DN 50;
- 428 m KMR DN 40;
- 958 m KMR DN 25;
- 3 318 round welds DN 15-40;
- 422 round welds DN 50-80;
- 10 round welds DN 150;
- 10 round welds DN 200;
- 2 x joint connections GRP DN 50;
- 2 x joint connections GRP DN 200;
- 15 underground ventilation / drainage DN 25/50;
- 92 underground shut-off valves DN 25-40;
- 8 underground shut-off valves DN 50-80;
- 290 KMR elbows DN 25-40;
- 132 KMR elbows DN 50-80;
- 4 pieces of KMR bends DN 150;
- 116 KMR prefabricated branches DN 40-80;
- 4 KMR prefabricated branches DN 200,
- 608 KMR socket construction Da 90 to Da 110;
- 412 KMR socket construction Da 125 to Da 160;
- 16 pieces KMR socket construction Da 250 to Da 315 with expansion padding, IPS wiring;
- 260 m steel pipelines DN 15-40 including fittings / connectors, fixings and insulation made of mineral fiber shells;
- 209 ball valves DN 15-40; Carry out SiGeKo and calibration
Planning services:
System-typical FW-KMR statics for the offered product with proof of the stretch padding and leakage warning system in a laying and wiring plan; Structural engineering; Traffic sign planning; 52 pieces of work plans of house connections with previous inspections.