The Operation consists of a heavy rehabilitation (partially destroyed building with collapsed frame) of a building of 200 square meters of right-of-way with treatment of its immediate surroundings. An identical reconstruction is desired, a variant may be proposed on the stained glass windows under the conditions provided for in Article 3 of this Rc. This contract consists of the following elements: - basic mission: Aps, Apd (Pc), Pro, Act, Det, Partial Exe/visa (Syn) (cf. Cctp), Aor/Gpa - complementary missions: Diag, Opc, Ssi, analysis of the overall cost, definition of the choice of equipment
The Operation consists of a heavy rehabilitation (partially destroyed building with collapsed frame) of a building of 200 square meters of right-of-way with treatment of its immediate surroundings. An identical reconstruction is desired, a variant may be proposed on the stained glass windows under the conditions provided for in Article 3 of this Rc. This contract consists of the following elements: - basic mission: Aps, Apd (Pc), Pro, Act, Det, Partial Exe/visa (Syn) (cf. Cctp), Aor/Gpa - complementary missions: Diag, Opc, Ssi, analysis of the overall cost, definition of the choice of equipment