Reorganization and rehabilitation of the cooperatives Gesamtschule Leeste, Schulstr. 40, 28844 Weyhe. The existing school building is a two-storey flat roof construction in reinforced concrete and masonry construction from the years 1973/74 with a total gross floor area of approx. 14,000 m
Presence and motion detectors, various interior lights (LED light channel, LED surface-mounted luminaire, LED downlight), luminaire mounting, KNX components (system devices, actuators, binary inputs, motion and presence detectors).