The order covers the extension of national road No. 22 on the section Zblewo - Sucumin.
The order shall, in particular, include:
- extension of national road No. 22 with a total length of approx. 5.9 km,
- extension of intersections on the reconstructed section of road,
- increasing the load capacity of the road surface structure to 115 kN / axle,
- construction of a pedestrian and bicycle path along the entire length of the extended section of national road No. 22, along with the construction of rest and recreation places for cyclists,
- construction and reconstruction of engineering structures (culverts) on the designed section of the national road,
- reconstruction/construction of sidewalks in the area of intersections and built-up areas, construction of asylums and pedestrian crossings,
- reconstruction of existing and construction of new bus bays,
- implementation of traffic calming elements,
- construction of a technological channel along the road,
- construction of acoustic screens,
- construction of culverts under exits,
- reconstruction of descents,
- reconstruction of the road drainage system,
- construction of road lighting,
- cutting down greenery interfering with the extension of the road,
- green development within the boundaries of the designed road lane,
- others, necessary for the proper functioning of the extended section of national road No. 22.
Estimated value of the order above €20,000,000.