6-lane extension of the A 43 between the junction Recklinghausen-Hochlarmark and the Emschertalbrücke (BAB km 32.950 to BAB km 34.160).
The works advertised in the list of services contain the following main services:
- about 3 pieces demolition and new construction of bridge structures,
- about 1 piece demolition and new construction of a retaining wall,
- about 1 piece of new construction rainwater retention basin,
- about 1 piece of creek laying,
- about 23 280 m
- about 8 300 m
- about 84 950 m
- make approx. 19 250 m of stripping,
- about 10 515 m
- about 7 725 m
- about 26 800 m
- pick up about 3,120 m curbs,
- dismantle about 397 pieces of LSW posts,
- about 1 000 m
- about 5 550 m
- break off approx. 250 m bored piles,
- break off approx. 1 480 m of drainage pipeline,
- remove approx. 44 shafts,
- make approx. 1,520 m of drainage pipeline (various DN and various materials),
- produce approx. 75 prefabricated shafts,
- produce approx. 7 pieces of special shafts,
- about 23 390 m
- about 57 600 m
- about 60 200 m
- about 40 070 m
- about 20 300 m
- make approx. 17,975 m connections and joints of various kinds,
- make about 1 300 m curbs.