Steel construction work according to DIN 18335 for the construction and installation of a hot-dip galvanized steel bridge and a hot-dip galvanized steel staircase.
Production and assembly of a hot-dip galvanized steel bridge and a hot-dip galvanized steel staircase as part of the construction of an upper stage at IGS Deidesheim.
Tiltel B:
- Ausführungsstatik
-Personal safety net made of PPE, approx. 184m²
-Hot-dip galvanized steel bridge, approx. 17.5 t
-Primer allowance, approx. 7 t
-Trapezoidal sheet H 80mm, approx. 92m²
-Trapezoidal sheet H 90mm, approx. 92m²
-Circumferential wheel angle, approx. 125m
-Stützenfüße HEB 269, 4 St
-Ankerkorb, 4 St
Title D2:
-Feuerverzinkte Stahltreppe S 235, 1 St