2nd phase of the general renovation and extension of the existing city bath in Salzgitter Lebenstedt.
Here: waterproofing, screed and tile work
screed:
Impact sound insulation 40 mm, 300 m
Impact sound insulation 50 mm, 80 m
Impact sound insulation 60 mm, 110 m
Floating screed 65 mm, 90 m
Floating screed 70 mm, 400 m
Floating screed on a slope 50 - 110 mm, 155 m
Composite screed in 2 layers on a slope, 515 m
Tile work:
Prepare underground 1610 m
Composite seal on walls 570 m
Composite seal on the ground 1040 m
Composite seal on stainless steel basin 105 m
Composite seal on EBT 57 pieces
Floor tiles 15 x 15 cm 730 m
Floor tiles 30 x 60 cm 310 m
Wallcovering h = 1.20 m I 320 m
Wallcovering h = 1.20 m II 100 m
Cut joints and close 200 m
Wallcovering h = 2.50 m 135 m
Base clothing h = 10 cm 215 m
Dressing stairs and modeling 45 m
Fine filling 235 m
Tiles on EBT DN 50 - 150 mm work 57 pieces
Duschnisch train 12 pieces
Work on tiles at the shower channel 16 m
Processing at bottom inlets 46 pieces