The Ottersleben elementary school is a five-class elementary school with day-care facilities.
The existing buildings are not enough to accommodate all pupils, so
that
the first classes are currently in a different building. For
the development of an extension building is part of the school management
coordinated room program. This sees a significant expansion
of the current stock of space.
Urban planning concept and building structure In Magdeburg-Ottersleben, in
Richard Dembny Street 41, is being built on the approx. 1,960m²
an extension of the primary school Ottersleben for school
also hoarding.
Lot 5.01 Civil engineering open space
Demolition and disposal
Clear small areas of concrete block pavement/edge borders, 150 m² of vegetable ground cover,
50 m³ construction remains/ rubble
earthwork
Approx. 300 m³ of soil to Z2 loosen and dispose of, 160 m² of embankment
Construct paths and squares, including substructure
425 m² sickerfähiges Betonsteinpflaster
400 m² Betonsteinpflaster
335 m² Rasenkammersteine
100 m2 Wassergebundene Wegedecke
75 m² Schotterrasen
415 m Randeinfassungen
100 m one-liner
Playing areas
100 m² fugenloser Fallschutzbelag
installations
2 stairs with 6 stg. each, 13 m seating steps, 40 m angle support elements,
23 m fall protection, handrails on stairs
Surface drainage
65 m pipes, 72 m drainage, 7 bottom inlets, drainage
Furnishing
22 bicycle support bars, 1 piece of play equipment, 1 table tennis table, 8 seating blocks, 16 concrete seat cubes, waste container,
Initial safety acceptance, 105 m fence, gate
greening
445 m² lawn, 250 m² planting area, 7 trees planting, façade greening