General renovation Walter-Höllerer-Realschule Sulzbach-Rosenberg - carpentry work fixed installations BA 2.
Carpentry fixtures BA 1:
- approx. 23 m
- approx. 18 classroom shelves;
- Approx. 15 solid oak bench seats;
- approx. 195 m of solid oak stair railings;
- approx. 49 m solid oak covers;
- approx. 1 pc L-shaped kitchen including built-in appliances;
- Approx. 1 shelf cabinet wall with alcoves.