The city council of Heppenheim is planning the new construction of the Nibelungenhalle as a 3-field sports hall for approx. 500 visitors with one extendable grandstand per hall section.
The subject of the tender is the drywall work.
Trockenbauarbeiten
Scope:
- Two-layer planked metal stud walls 15 cm, both sides with hard plasterboard planking: 60 m
- Two-layer planked metal stud walls 15 cm, one side with hard plasterboard planking and one side with cement board planking: 182 m
- Two-layer planked metal stud walls 12.5 cm, one side with hard plasterboard cladding, one side with cement board cladding: 30 m
- Two-layer planked pre-walls 10 cm, with hard plasterboard planking on one side, installation space varies: 150 m
- Two-layer planked installation wall 20-40 cm, both sides with hard plasterboard planking, installation space varies: 171 m
- Two-layer planked installation wall 30 cm, one side with hard plasterboard planking, one side with cement building board planking, installation space varies: 161 m
- Two-layer planked installation wall 30 cm, both sides with cement board planking, installation space varies: 80 m
- door openings in metal stud walls: 6 pieces,
- Suspended wood wool ceilings, 1.25 x 0.625 m: 155 m
- Acoustic grid ceilings, 0.625x 0.625 m: 245 m