Renovation of the fire detection of an Individual Installation of the CEA/DAM centre in Valduc
The purpose of the contract is to renovate the fire safety system of an individual installation of the CEA/DAM Centre in Valduc. The market includes the study and replacement of the entire detection system, from detectors to ECS to bus cabling. The replacement of the fire safety plc is also on the market, integrating the redundancy of this PLC, as well as the addition of some fire dampers and the management of the detritiation valves. Finally, the replacement of supervision is included.