Electrical engineering installation works | Tenderlake

Electrical engineering installation works

Contract Value:
NOK 12M - 12M
Notice Type:
Contract award notice – utilities
Published Date:
17 September 2021
Closing Date:
Location(s):
NO082 Viken (NO Norway/NORGE)
Description:
Gardermoen Wastewater Treatment Plant - prequalification for an electrical contract, EE01.

Ullensaker Municipality shall expand the capacity at Gardermoen Treatment Plant. In addition to a considerable capacity expansion, the new Gardermoen Treatment Plant must fulfil significantly more stringent requirements concerning the reduction of the total amount of phosphor used in the treatment process. The expansion will occur through building a new treatment plant in addition to the existing treatment plant, new inlet pump station for the new treatment plant and a new pre purification plant in order to increase the purification capacity for de-icing fluid, C-diol, from the airport. In addition to the expanded treatment capacity, the existing administration building will also be upgraded.

The expansion of Gardermoen Treatment Plant, the UGRA project, will consist of several different contracts. This notice applies to the electrical contract, EE01.

The new treatment plant comprises approx. 4,800 m2 footprint with a main slab level, lower floor and basement. The electrical contract includes the delivery of permanent electricity supply to a new treatment plant from a new transformer to the main distributions in switchboard rooms. Furthermore, the contract includes electricity supply from the main distribution to the switchboard for process (which will supply all machines and processing installations). Board for processing as well as cabling and connection from board to process components are included in another contract. The electrical contract also includes laying as well as all cabling and connection for lights and sockets, emergency lighting systems, ventilation, heating systems, comprehensive fire alarm systems, lightning conductors and the necessary data dispersion network for the treatment plant.

The new treatment shall have backup power supply for selected parts of the process. Included in the electrical contract is also the delivery and installation of backup power units.

In addition to a new treatment plant, a new inlet pumping station and a new pre-processing plant shall be established. The electrical contract also includes lights and sockets in a new inlet pumping station and a new pre-processing plant. Power supply for lights and sockets in a new inlet pumping station and a new pre-processing plant.

The current administration shall be reconstructed. The electrical contract includes all electrical installation work in connection with the reconstruction. This includes i.a. dismantling / removal of parts of existing installations, and installation of lights and sockets in the reconstructed part of the building.

Awarded to:
Gardermoen Wastewater Treatment Plant - prequalification for the electrical contract, EE01.
Nordengen AS, NANNESTAD (NO)
Download full details as .pdf
The Buyer:
Ullensaker kommune
CPV Code(s):
30195200 - Electronic copyboards or accessories
31625200 - Fire-alarm systems
42961100 - Access control system
45312100 - Fire-alarm system installation work
45315100 - Electrical engineering installation works