structural work
Construction site equipment 1
Excavation of foundation pit 30 m3
In-situ concrete as infill concrete 69m3
Cast-in-place concrete ceiling 22cm 1805 m2
Cast-in-place concrete IW 25cm 1520 m2
Formwork IW 2-section 3040 m2
Reinforcing steel 126,300 kg
FBV-System in horiz. 1050 m2
XPS PW-dh 120mm 410 m2
KSL-R(P)-MW 15cm 185 m2
Concrete-resistant plastic 1381 m
MiWo 16cm 2-ply 1453 m2
Supply facing stone 1785 m2
Fabrication facing material 1785 m2
Standgerüst, LK4 2040 m2