The order covers the design, delivery, installation and commissioning of photovoltaic installations consisting of photovoltaic modules placed on the roofs of buildings and on the ground. Number of buildings -11. Total power 178 kW.
The contract covers the design, delivery, installation and commissioning of photovoltaic installations consisting of photovoltaic modules placed on the roofs of buildings and on the ground, on structures guaranteeing durability and reliability of installation, in the locations and with the powers given in the table below. The actual power of the installation should be equal to or less (by a power less than the power of a single panel) than the power given in the table. Location of the investment Power PV Assumed location of the Commune Office in Poświętne - Dz. No. 55/1 - Poświętne precinct 40 roof S + land B. Prus Primary School in Poświętne - Dz. No. 92 - Poświętne precinct 40 roof S + land Fire Station in Poświętne - Dz. No. 54/2 and Dz. No. 47/2 - Poświętne precinct 6 roof S-E Dom Kultury w Poświętne - Dz. No. 55/2 and 89/1 - Poświętne precinct 30 roof + land Common room in Grochy - Dz. No. 113 and 111/1 - Grochy Stare precinct and Niemierzęta 6 roof S Common room in Wilków Stary - dz. nr 307/1 i 307/2 - precinct Wilkowo Stare 6 roof S-W Świetlica w Brzozów Stary - dz. nr 146/1 - precinct Brzozowo Stare 10 roof S-E Świetlica w Pietkowo - dz. nr 189 precinct Pietkowo 16 roof S-W + flat roof + ground Building after the former primary school in Pietków - dz. nr 108/3 6 roof S-W Świetlica w Zdrody Nowe - dz. nr 22 precinct Zdrody Stare 6 ground S Świetlica w w Porośl Wojsławy - Dz. nr 58/2 precinct Porośl Wojsławy 6 dach S