The Garmisch-Partenkirchen market plans to expand and restructure the Mayor Schütte primary and middle school in the district of Partenkirchen.
In advance, a feasibility study was developed for the decision in the political bodies, which provides for a breakdown into six construction phases:
- 1st BA - demolition hard court;
- 2nd BA - New primary school building and redesign of outdoor facilities (see Figure 2);
- 3rd BA - Middle School Restructuring (Main Building)
- 4th BA - Conversion/refurbishment/extension (here only as optional designation)
- 5th BA - demolition sports hall
- 6th BA - New 3-fold sports hall with sports field on the roof
- 7th BA - Expansion storey building.
The following measures are envisaged, among others:
- Extension buildings for the primary school (intended location: area between the main building and Münchner Strasse);
- Connection of the primary school extension to the existing main building (connecting structure with administration and special rooms);
- redesign of schoolyard areas for primary and middle school (planning and implementation by the planner for the outdoor facilities - assigned separately);
- the retrieval and delivery situation is currently not satisfactory, this is to be solved (creatively) in the course of the redesign of the outdoor areas (planning and implementation by the planner for the open spaces - will be assigned separately);
- Overall concept including expansion options for storey construction (planned as 7th BA).
The costs of the planned measures are estimated at around 10.5 million euros/gross for the new primary school (KG 300 - 400) and approx. 1.78 million euros/gross for the renovation measures (KG 300 - 400) and around 92,000 euros for the demolition.
The primary school (extension and connecting structures) is planned to be completed by the beginning of 2024. The main building and the storey building continue to be used, and the primary school is outsourced (containers and pavilion, which will be demolished later).
Planning of technical equipment for plant groups 1 - 3 and 7 - 8The following services are to be awarded:
- Lot 1: Technical equipment (work phases 1 - 9 according to HOAI § 55 in conjunction with Annex 15, plant groups 1 - 3 and 7 - 8).
The required services are based on the HOAI service profiles. The client reserves the right to contract in stages and, if necessary, in sections.
The following services are optionally included:
- 3rd BA - Middle School Restructuring (Main Building)
- 4th BA - Conversion/Renovation of Floor Construction
Planning of technical equipment for plant groups 4 - 6The following services are to be awarded:
- Lot 2: Technical equipment (work phases 1 - 9 according to HOAI § 55 in conjunction with Annex 15, plant groups 4-6).
The required services are based on the HOAI service profiles. The client reserves the right to contract in stages and, if necessary, in sections.
The following services are optionally included:
- 3rd BA - Middle School Restructuring (Main Building)
- 4th BA - Conversion/Renovation of Floor Construction