As a substitute measure for the rehabilitation of the 380 kV Pradella - La Punt line of the Siwssgrid, the Engadiner Kraftwerke AG (EKW) realized a buried cabling of the existing Pradella - Zernez - Bever valley line.
The subject of this tender is the demolition of the existing 60 kV / 16 kV underground line between Zuoz and Bever.
On a distance of about 50 kilometers, about 1 100 masts will be dismantled.
The works are divided into 7 lots:
- Lot 1: line construction company: demolition of Zuoz-Brail conductors,
- Lot 2: line construction company: demolition of Brail-Zernez conductors,
- Lot 3: cable construction company: dismantling of conductor cables Zernez-Giarsun,
- Lot 4: pipeline construction company: dismantling of conductor cables Giarsun-Pradella,
- Lot 5: pipeline construction company: demolition of concrete poles, tubular steel, lattice towers and trestles,
- Lot 6: Civil engineering: dismantling of wooden poles and foundations Zuoz-Giarsun,
- Lot 7: Civil engineering: dismantling of wooden poles and foundations Giarsun-Pradella.
Here are the submission documents for lots 6 and 7.
As a substitute measure for the rehabilitation of the 380 kV Pradella - La Punt line of the Siwssgrid, the Engadiner Kraftwerke AG (EKW) realized a buried cabling of the existing Pradella - Zernez - Bever valley line.
The subject of this tender is the demolition of the existing 60 kV / 16 kV underground line between Zuoz and Bever.
On a distance of about 50 kilometers, about 1 100 masts will be dismantled.
The works are divided into 7 lots:
- Lot 1: line construction company: demolition of Zuoz-Brail conductors,
- Lot 2: line construction company: demolition of Brail-Zernez conductors,
- Lot 3: cable construction company: dismantling of conductor cables Zernez-Giarsun,
- Lot 4: pipeline construction company: dismantling of conductor cables Giarsun-Pradella,
- Lot 5: pipeline construction company: demolition of concrete poles, tubular steel, lattice towers and trestles,
- Lot 6: Civil engineering: dismantling of wooden poles and foundations Zuoz-Giarsun,
- Lot 7: Civil engineering: dismantling of wooden poles and foundations Giarsun-Pradella.