Building description: The construction phase is divided into three rectangular buildings, with two transverse and one longitudinal structure,
Building dimensions: transverse structure A: approx. 26.50 m x 10.60 m, longitudinal structure B: approx. 37.80 m x 10.60 m, cross structure C: approx. 58.40 m x 10.60 m,
Type of construction: Reinforced concrete columns and beams as well as stiffening walls plastered in reinforced concrete or brick construction,
Roof structure in wood with fire protection cladding,
Wall infill in column construction and with window or facade system,
Windows / facades: plastic window and plastic window elements, facade cladding non-combustible (fiber cement panels),
Roof construction, roofing: wooden truss construction with cross beams and roof sheathing, double standing seam cover in aluminum color coated
Outdoor facilities - civil engineering workThe planning includes the outdoor facilities of the Gymnasium Zwiesel in the area of the main entrance along Dr.-Schott-Straße (BA 1) and the canteen courtyard (BA 2) with civil engineering work in full expansion and supplementary planting work.
- Approx. 750 m² of asphalt demolition incl. superstructure,
- Pave approx. 500 m² of asphalt incl. each with superstructure,
- install and remove approx. 350 m² of granite pavement,
- install and remove approx. 80 m² of concrete slab pavement,
- supply and install approx. 250 m² of concrete slab pavement,
- produce approx. 130 m² of concrete turf joint covering,
- make about 225 m of one-liner granite,
- make about 60 m of granite borders,
- install approx. 60 m of box gutters,
- install approx. 100 m² of fall protection mat covering,
- approx. 1 pc. Install curved bench sculpture,
- install approx. 1 piece of grease trap including lifting system,
- deliver and plant approx. 8 solitary trees,
- deliver and plant about 9 solitary shrubs,
- ca. 100 m² Staudenmischpflanzung,
- Supply and sow approx. 150 m² of topsoil
Execution:
immediately after placing the order,
Completion of civil engineering work: 39 week 2023
Completion of planting work: CW 50, 2023
Outdoor installations - Electrical workRenewal and expansion of the outdoor lighting with external cabling and electrical distribution as well as cable duct system:
BA 1 + 2: Outdoor facilities main entrance, inner courtyard canteen area
BA 3: New parking lot with garage
- 500 m of cables and wires,
- 500 m Verlegesysteme,
- 50 St. Installationsgeräte,
- 2 St. Elektroverteiler,
- 200 m FM-DV cabling,
- 18 St. Mastleuchten,
- 30 pcs outdoor lights
Execution:
BA 1 + 2: CW 28 2023 - CW 39 2023
BA 3: Week 15 2024 - Week 39 2024