Structural fixtures -SAUNA-
Aquasport GmbH intends to partially dismantle the existing indoor swimming pool Einsiedlerbach an Hameln, to renovate it and to expand it further.
The total output of this work is essentially divided into:
- Drawing and planning services for a textile sauna
- Textile sauna with underbench oven (polgonal floor plan, i.M. t/w/h = 3.0m x 3.5m x 2.30m)
- Cabin construction in wooden element construction, inside/outside with profile boards
- Glass door construction with handle bar
- 3-stage couch construction with backrests and LED lighting (indirect)
- Base construction for floor frames
- Ventilation system for on-site connection
- Sauna control for connection to building automation
- Notruftaster