The school building at Schulstraße 15 is being renovated. The town hall is newly integrated.
The building complex consists of 3 sections.
— Building part A (BA 1) includes basement, ground floor, 1st floor, 2nd floor, DG (not developed). NOT ADVERTISED HERE
— Building part B (BA 2) (façade height 10 m) includes ground floor, 1st floor, 2nd floor, DG (not developed). NOT ADVERTISED HERE
— Building C (BA 3) Gymnasium (this call for tenders).
— Building D (BA 3) Gymnasium – Social wing to be rebuilt
The interior equipment for the gym is put out to tender:
Gymnastics equipment (e.g. horizontal bar, parallel bars...)
Sprossenwand
Kletterleiter
Schaukelanlage
Equipment for various types of equipment. Ball sports
Etc.