Realization, in firm slice, of a test pilot firing to confirm the feasibility of the directional drilling then in optional slice:
- directional drilling to cross the Loire,
- supply and assembly of a DN700 steel pipe.
Realization of a test pilot test to confirm the feasibility of the directional drilling, in firm slice, then in optional slice:
- directional drilling to cross the Loire,
- supply and assembly of a DN700 steel pipe.