Non-static termination.
- Removal of non-load-bearing walls (masonry, drywall), incl. Clothing, approx. 160 m
- Dismantling of non-load-bearing floor / ceiling structures, 800 m
- dismantling door elements and various installations,
- disassembly of all TGA components (sanitary, thermal systems, ventilation, ELT, data technology),
- Disposal according to AVV key.