At the Mühlenredder in Reinbek, a new fire brigade tool shed with a surface of 3200m² built in timber construction is being built on a 6400m² plot surrounded by schools and residential buildings. The property is a former grandplatz of the local sports club and is therefore undeveloped. There is a so-called kink in front of the property, a planted wall that must be protected during the construction project.
Supply and installation of ventilation systems for the ventilation of shower and changing areas as well as an exhaust gas extraction system for fire engines. Installation of small room fans and an exhaust system for a bat room including a sewer network. Installation of a split air conditioner for cooling technology.