District-heating plant construction work | Tenderlake

District-heating plant construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 December 2019
Closing Date:
14 January 2020
Location(s):
DK022 Vest- og Sydsjælland (DK Denmark/DANMARK)
Description:
Rødby Heating - Straw boiler plant

Rødby Heating Plant will establish a 8.0 MW straw-fired heating plant, which will supply district heating to Rødby. This contract includes the supply of electricity, control and machine to a complete straw firing plant incl. design, delivery, assembly and commissioning.

This supply includes the supply of electricity and machinery for a straw-fired heating plant with a thermal output of 8.0 MW. The range includes robotic crane, firing system, boiler, grate, flue gas cleaning, chimney, ash transport and district heating installations as well as electrical and SRO systems. The tendering procedure is a total contract. The supplier thus becomes responsible for all planning, delivery, installation and commissioning.

Buildings and VAK are offered in parallel in independent tenders. The contract limits are stated in the tender documents.

Download full details as .pdf
The Buyer:
Rødby Varmeværk a.m.b.a.
CPV Code(s):
45251250 - District-heating plant construction work