Solar photovoltaic modules | Tenderlake

Solar photovoltaic modules

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
30 May 2023
Closing Date:
28 June 2023
Location(s):
PL713 Piotrkowski (PL Poland/POLSKA)
Description:
Renewable Energy Sources in the Opoczno Commune and in the Poświętne Commune

4.1. The subject of the contract is the design, delivery, assembly and commissioning of photovoltaic microinstallations on residential real estate located in the Opoczno Commune and the Poświętne Commune, which were indicated in the PFU – Annex No. 1 to the SWZ as part of the project "Renewable Energy Sources in the Opoczno Commune and in the Poświętne Commune".

Design, delivery, assembly and commissioning of microinstallations with a capacity of 2.1 kWp and 2.8 kWp

1. Design, delivery, assembly and commissioning of micro-installations with a capacity of 2.1 kWp and 2.8 kWp, including: 1) as part of the subject of the contract in the scope of design works, the Contractor will perform: - inventory of the actual technical condition of facilities for the installation of PV systems as at the date of commencement of installation of the installation, - inventory of the actual state of the electrical installation of facilities in terms of installation of PV systems as at the date of commencement of installation of the installation, - development of detailed designs of individual installations. 2) as part of the subject of the contract in the scope of executive works, the Contractor shall perform the following installation works, including the investment addresses indicated on pages 3-13 of the PFU: - verification of the technical condition of the electrical installation in individual buildings, - execution of the necessary structures for the installation of photovoltaic modules, - installation of photovoltaic modules on the structure, - installation of inverters / inverters to the photovoltaic installation, - location of cabling for connecting modules photovoltaic, - connection of inverters / inverters of photovoltaic modules to the investor's power grid, - modernization of the electrical switchboard, - installation of the automation system, - installation tests and checking the proper operation of the apparatus, - commissioning of the PV system and regulation, - training of the operator. 3) As part of the subject of the contract in the scope of construction works, the Contractor shall perform the following works, in the addresses of the investment indicated on pages 3-13 of the PFU: - execution of the necessary structures on the ground (hammered structures), - execution of passages through partitions (ceiling, roof, walls) for the location of electrical cables and their protection, - sealing culverts in places of cable passages, - performing cleaning works aimed at organizing the construction site and bringing the object to the original state. The total number of installations will be 149 pcs., including 120 pcs. in the Municipality of Opoczno and 29 pcs. in the Poświętne Commune. 2. The detailed scope of works to be performed by the Contractor is described in the PFU, which constitutes (Annexes No. 1 to the SWZ) and is an integral part of the SWZ.

Design, delivery, assembly and commissioning of micro-installations with a capacity of 3.5 KWp and 3.6 kWp

1. Design, delivery, assembly and commissioning of micro-installations with a capacity of 3.5 KWp and 3.6 kWp, including: 1) as part of the subject of the contract in the scope of design works, the Contractor will perform: - inventory of the actual technical condition of facilities for the installation of PV systems as at the date of commencement of installation of the installation, - inventory of the actual state of the electrical installation of facilities in terms of installation of PV systems as at the date of commencement of installation of the installation, - development of detailed designs of individual installations. 2) as part of the subject of the contract in the scope of executive works, the Contractor shall perform the following installation works, including the investment addresses indicated on pages 3-13 of the PFU: - verification of the technical condition of the electrical installation in individual buildings, - execution of the necessary structures for the installation of photovoltaic modules, - installation of photovoltaic modules on the structure, - installation of inverters / inverters to the photovoltaic installation, - location of cabling for connecting modules photovoltaic, - connection of inverters / inverters of photovoltaic modules to the investor's power grid, - modernization of the electrical switchboard, - installation of the automation system, - installation tests and checking the proper operation of the apparatus, - commissioning of the PV system and regulation, - training of the operator. 3) As part of the subject of the contract in the scope of construction works, the Contractor shall perform the following works, in the addresses of the investment indicated on pages 3-13 of the PFU: - execution of the necessary structures on the ground (hammered structures), - execution of passages through partitions (ceiling, roof, walls) for the location of electrical cables and their protection, - sealing culverts in places of cable passages, - performing cleaning works aimed at organizing the construction site and bringing the object to the original state. The total number of installations will be 214 pcs., including 185 pcs. in the Municipality of Opoczno and 29 pcs. in the Poświętne Commune. 2. The detailed scope of works to be performed by the Contractor is described in the PFU, which constitutes (Annexes No. 1 to the SWZ) and is an integral part of the SWZ.

Design, delivery, assembly and commissioning of microinstallations with a capacity of 4.32kWp, 5.04kWp and 5.76kWp

1. Design, delivery, assembly and commissioning of micro-installations with a capacity of 4.32 kWp, 5.04 kWp and 5.76 kWp", including: 1) as part of the subject of the contract in the scope of design works, the Contractor will perform: - inventory of the actual technical condition of facilities for PV systems installations as at the date of commencement of installation of the installation, - inventory of the actual state of the electrical installation of facilities in terms of installation of PV systems as at the date of commencement of installation of the installation, - development of detailed designs of individual installations. 2) as part of the subject of the contract in the scope of executive works, the Contractor shall perform the following installation works, including the investment addresses indicated on pages 3-13 of the PFU: - verification of the technical condition of the electrical installation in individual buildings, - execution of the necessary structures for the installation of photovoltaic modules, - installation of photovoltaic modules on the structure, - installation of inverters / inverters to the photovoltaic installation, - location of cabling for connecting modules photovoltaic, - connection of inverters / inverters of photovoltaic modules to the investor's power grid, - modernization of the electrical switchboard, - installation of the automation system, - installation tests and checking the proper operation of the apparatus, - commissioning of the PV system and regulation, - training of the operator. 3) As part of the subject of the contract in the scope of construction works, the Contractor shall perform the following works, in the addresses of the investment indicated on pages 3-13 of the PFU: - execution of the necessary structures on the ground (hammered structures), - execution of passages through partitions (ceiling, roof, walls) for the location of electrical cables and their protection, - sealing culverts in places of cable passages, - performing cleaning works aimed at organizing the construction site and bringing the object to the original state. The total number of installations will be 178 pcs., including 161 pcs. in the Opoczno Commune and 17 pcs. in the Poświętne Commune. 2. The detailed scope of works to be performed by the Contractor is described in the PFU, which constitutes (Annexes No. 1 to the SWZ) and is an integral part of the SWZ.

Download full details as .pdf
The Buyer:
GMINA OPOCZNO
CPV Code(s):
09331200 - Solar photovoltaic modules
44112410 - Roof frames
45261215 - Solar panel roof-covering work
45300000 - Building installation work
45311100 - Electrical wiring work
45311200 - Electrical fitting work
45312310 - Lightning-protection works
45315300 - Electricity supply installations
71200000 - Architectural and related services
71300000 - Engineering services
71314100 - Electrical services
71320000 - Engineering design services
71321000 - Engineering design services for mechanical and electrical installations for buildings
71323100 - Electrical power systems design services
71326000 - Ancillary building services
71334000 - Mechanical and electrical engineering services