For each tank the Overfill Protection system and ATG Level system are fully functional and operable. Phase-2 will ready the HV System to enable the operation of Transfer Pumps (1+1). In addition, a new NATO-BPCS will be Installed to allow ease of operation. This requirement covers Phase 2 EC&I installation scopes of works
For each tank the Overfill Protection system and ATG Level system are fully functional and operable. Phase-2 will ready the HV System to enable the operation of Transfer Pumps (1+1). In addition, a new NATO-BPCS will be Installed to allow ease of operation. This requirement covers Phase 2 EC&I installation scopes of works.