Planning, delivery, installation and IBN of connecting pipelines (BoP) between a heat storage tank and an electrode boiler to the existing system in the combined heat and power plant of Stadtwerke Flensburg.
Stadtwerke Flensburg GmbH (SWFL) operates a combined heat and power plant for the generation of electricity and district heating on the property Batteriestraße 48 in 24939 Flensburg.
SWFL plans to build an electrode boiler (EHK) and a heat storage system (WSP). The EHK with a thermal output of 40 MW is to feed the generated heat into the WSP. The WSP has a storage capacity of 900MWh and can be either loaded or unloaded with a maximum output of 90MW. The WSP and EHK have already been awarded in separate lots.
The scope of supply and services of this tender for lot BoP includes:
• Connecting pipelines WSP: approx. 150m DN600
• Connecting pipelines EHK: approx. 80m DN350
• Hilfsdampfanbindung WSP, 6 bar: ca. 60m DN65
• Fittings are provided by the contractor, but must be installed by the contractor
•Insulation
• Detail engineering (calculation, pipe-2, etc.)
• Rohrlager
• Design according to EN 13480