it is a framework agreement with purchase orders of 31 lots (detailed in the Ccap and in the Cctp), concluded without minimum and with a maximum in quantity. Each lot is in single allocation. The estimated annual cost excluding VAT is therefore EUR 116 875 for non-renewable lots and EUR 620 441 for renewable lots - the total cost excluding VAT estimated over the total duration of the contract is therefore EUR 2 326 653.75
it is a framework agreement with purchase orders of 31 lots (detailed in the Ccap and in the Cctp), concluded without minimum and with a maximum in quantity. Each lot is in single allocation. The estimated annual cost excluding VAT is therefore EUR 116 875 for non-renewable lots and EUR 620 441 for renewable lots - the total cost excluding VAT estimated over the total duration of the contract is therefore EUR 2 326 653.75