Engineering design services for the construction of civil engineering works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 October 2023
Closing Date:
22 November 2023
Location(s):
PL POLSKA (PL Poland/POLSKA)
Description:
Preparation of design documentation along with author's supervision for the task entitled Design documentation for the Wrocław Railway Junction as part of the "Preparatory Projects" project

The subject of the Contract is the preparation of design documentation necessary for the implementation of the project entitled "Design documentation for the Wrocław Railway Junction" as part of the "Preparatory Projects" project, together with the opinions, agreements, decisions necessary to carry out the construction works required by law (Phase I) and the author's supervision at the stage of construction works under the right of option (Phase II).

The subject of the Contract is the preparation of design documentation necessary for the implementation of the project entitled "Design documentation for the Wrocław Railway Junction" as part of the "Preparatory Projects" project, together with the opinions, agreements, decisions necessary to carry out the construction works required by law (Phase I) and the author's supervision at the stage of construction works under the right of option (Phase II).

The main results of the Order are to obtain:

1) Program-Spatial Concept (KPP);

2) construction projects together with geotechnical and geological and engineering documentation;

3) materials necessary to obtain a decision on environmental conditions,

4) a set of materials necessary to obtain building permits along with obtaining the building permits themselves

5) executive drafts;

(6) tender materials necessary to select contractors for construction works

(7) certification at the design stage;

8) author's supervision over the execution of works,

9) final building permits;

10) other documents and permits necessary for the execution of construction works

The lead time of the Order is 3067 days:

1) Phase I – 1330 calendar days from the date of signing the agreement

2) Phase II Right of Option – from the day following the date of concluding the contract with the construction contractor by the Contracting Authority until the last final acceptance; This time is defined as 1737 calendar days

A detailed description of the subject of the Order can be found in Volume III SWZ-"OPZ".

The documents are available at https://platformazakupowa.plk-sa.pl, under the reference number of the contract in question.

Download full details as .pdf
The Buyer:
PKP Polskie Linie Kolejowe S.A.
CPV Code(s):
71248000 - Supervision of project and documentation
71322000 - Engineering design services for the construction of civil engineering works