The expansion of the UF/HF production capacity must function completely independently of the existing UF/HF production capacity.
The expansion should be operational from 1-1-2027.
Expand the production capacity of UF/HF Heemskerk (psHK) by 78% (additional 15.6 Mm3/year vs. 20.0 Mm3/year currently).
The Procurer uses the following plot layout:
• Lot 1 = Contractor specialized in civil, architectural and mechanical disciplines
• Lot 2 = Contractor specialized in electrotechnical and instrumental (E&I) discipline
• Lot 3 = Contractor specialized in building Ultrafiltration (UF), Hyper Filtration (HF) and Cleaning in Place (CIP) installations and chemical dosing plants.
Contractor specialized in civil, architectural and mechanical disciplinesCivil, architectural and mechanical engineering work.
Contractor specialized in electrotechnical and instrumental (E&I) disciplineContractor specialized in electrotechnical and instrumental (E&I) discipline
Contractor specialized in building Ultrafiltration (UF), Hyper Filtration (HF) and Cleaning in Place (CIP) installations and chemical dosing installations.Contractor specialized in building Ultrafiltration (UF), Hyper Filtration (HF) and Cleaning in Place (CIP) installations and chemical dosing installations.