Sanitary work, company building for the Leonberg fermentation plant.
TGA in the delivery/processing hall, the control room, the digestate conditioning hall and the future workshop, as well as the heat distribution from the CHP to the consumers.
This includes, among other things, the TW distribution, sanitary equipment, drainage pipes, air conditioning, ventilation system, etc.
The Technical Building Equipment of the Fermentation Plant (VGA) lot comprises the following areas:
Component delivery hall:
- Drinking water installation in the production hall consisting of hose boxes in wall mounting with frost protection
- Heating cable installation in the production hall up to the flow and return of the HVAC system of the sorting box
Component of the control room extension delivery hall:
- Drinking water installation in the control room annex
- Sanitary installations consisting of 2 pcs toilets; 3 pcs sink; 1 urinal incl. hygienic flush
- Sewage pipes incl. string ventilation
- Heating supply consisting of transfer station, heating piping and radiators
- Air conditioning consisting of 2 indoor units in the control room, 1 indoor unit in the control room and an outdoor unit
Component fermentation residue conditioning:
- Drinking water installation consisting of 2 washbasins, 2 emergency showers and hose box for wall mounting
- Sewage pipes
- Heating piping from the on-site transfer station with piping and air heater
- Air conditioning control room consisting of 1 indoor unit and 1 outdoor unit
Component workshop:
- Drinking water installation consisting of washbasin and hose box for wall mounting
- Sewage pipes
- Heating piping consisting of transfer station, heating piping and radiators or air heaters