High School Am Merzdorfer Park, Merzdorfer Straße 48, 01591 Riesa,
1.2 Energetic new sports hall (ERDF) and non-energetic new sports hall (KInvFG II)
Lot SH-31 Heavy and light current.
The service includes the construction of high-voltage and low-voltage systems in the newly constructed two-field sports hall.
The following are provided on the strong current side: emergency lighting, low-voltage installation, lightning protection, lighting systems.
Furthermore, the following low-voltage technology is provided: computer network, clock system, ELA, BMA, burglar alarm system.
The required scope of services highlights the numerous interfaces to third-party services. All strong and low-current connections for the 2-field sports hall, as well as the central technology (NSHV, EMA, BMA, SiBe, clock system, network) are located in the school building.
In addition, the extensive system technology (RLT systems, ISP of the MSR) for the air conditioning of the sports hall should be emphasized, resulting in numerous interfaces for the electrical installation.