This consultation concerns the servicing of the Quai de Petit Couronne (QPC) site and the ecological compensation associated with the project. The work under the contract focuses on the servicing of future plots and on the creation of an ecological zone comprising a knot and a hake on an area of 2.07 ha comprising 1,500 m
The main work to be carried out are for batch 1:
— the earthworks necessary for the construction of the roadway, ecological knob, hake and trenches for the establishment of networks;
— the implementation of runoff management systems (shut-off valves, oil deoilers, pipelines, check valves, etc.);
— the realization of bituminous layers adapted to a traffic of 400 pl/d/direction.
Electrical distribution and lightingThe main work to be carried out are for batch 2:
— the electrical distribution of all the plots,
— the distribution and installation of lighting of service lines.
Drinking water supplyThe main work to be carried out are for lot 3:
— the supply and installation of the drinking water distribution network in the trenches carried out by lot 1 until the entrance to each parcel.