Special civil engineering, earthworks and bored piles.
Special civil engineering work, earthworks and bored piles:
- approx. 235 exploratory boreholes ø120-160 mm,
- approx. 235 depth soundings incl. Evaluation,
- About 4 000 m
- About 17 500 m
- about 11 500 m
- about 16 200 m
- about 6 500 m
- approx. 21,500 t removal / disposal of excavated material LAGA Z 0,
- approx. 2 000 tonnes of discharge / disposal of excavated material LAGA Z 1.1,
- approx. 2 000 t removal / disposal of excavated material LAGA Z 1.2,
- approx. 2 000 t removal / disposal of excavated material LAGA> Z 2, DK 2,
- approx. 2 000 t removal / disposal of excavated material LAGA> Z 2, DK 1,
- deliver and set up approx. 21 running meters of truss support bracket, h = 600 cm,
- approx. 2 350 running meters of in-situ concrete piles, DN 750 according to DIN EN 1536 (180 p.),
- approx. 810 running meters of in-situ concrete piles, DN 900 according to DIN EN 1536 (55 p.),
- approx. 80 tons of reinforcing steel.