Environmental improvement works

Contract Value:
GBP 2M -
Notice Type:
Contract Notice
Published Date:
26 April 2022
Closing Date:
25 May 2022
Location(s):
UKE3 South Yorkshire (UK UNITED KINGDOM)
UKF1 Derbyshire and Nottinghamshire (UK UNITED KINGDOM)
Description:
MFF 133 2022-2025 moorland restoration work sites in the Peak District and South Pennines

1. The objective of this Contract is to deliver a suite of Works on 17 upland Sites in the Peak District and South Pennines SAC. The sites are split into 9 packages of work. The aim of the Works suites are to stabilise and revegetate bare peat, restore hydrology, and increase biodiversity on the Sites.

2. The Works comprise the following tasks:

a. Supply and delivery of Materials required to complete the Works, unless otherwise stated.

b. Appropriate storage of Materials, as necessary.

c. Supply and delivery of suitable Trackway for storing materials on (see Packages if required).

d. Forwarding of Materials and Equipment required to complete the Works to and within Works Sites, excluding Airlifting

e. Planning the Aerial Load Lifting Works, including marking out drop locations and working in collaboration with the Authorities Airlifting Contractor to deliver the works

f. Marshalling of Aerial Load Lifting, including materials drops

g. Installation of Stone Dams into gullies

h. Installation of Peat Dams into gullies

i. Installation of Peat Bunding

j. Re-profiling of hags and gully sides


Chellow Whole Site works pacakge

a. The objective of this works package is the delivery of various works on multiple works sites across the Chellow water treatment works catchment.

b. The works include:

i. The supply, cutting & spreading of heather brash

ii. Receiving delivery of initial & maintenance lime, seed & fertiliser & application by hand to bare peat areas

iii. The supply & construction of stone dams & coir log dams

For details of quantities and location please see the Invitation to Tender (appendix 1)

iv. The supply & installation of temporary trackway at Thornton Lift Site

v. The construction of peat dams & re-profiling of gully systems

vi. The planting of sphagnum moss plug plants

vii. Heather cutting for diversification

viii. Landscaping of 65 metres of bridleway

ix. The marshalling of all aerial load lifting operations required for the works


Twizle Head Whole Site Works package

Brash (Bags) 443

Lime, Seed & Fertiliser (total) ha 2.17

Year 2 Lime and Fertiliser (total) ha 2.17

Re-profiling (m) 10344

Sedge/dwarf shrub Plug plants for Brash (@10,000 per ha) (ha) 2.17

Sedge/dwarf shrub Plug plants (@2,500 per ha) (ha) 2.83

Grip/Gully Blocking: Peat Dam (units) 309

Grip/Gully Blocking: Timber Dam (units) 227

Grip/Gully Blocking: Stone Dam (units) 355


Longwood Catchment (Deanhead, Close Moss, Cupwith Hill Pule, Bobus, Wessenden) Whole Sites Package

Brash, bunding, application of lime seed and fertiliser, maintenance of lime seed and fertiliser, re-profiling, sphagnum planting, planting of shrub plug plants, grip/gully blocking (peat, low peat, timber, stone & coir), molina cutting and heath cutting in quantities For more detail on quantities and location please see the Invitation to Tender (appendix 3).


Soyland

Grip/Gully Blocking - Peat (Dam unit) 719

Grip/Gully Blocking - Timber (Dam unit) 22

Grip/Gully Blocking: Heather Bales 399

Grip/Gully Blocking - Stone (Dam unit) 113

Bunding (ha) 36

Re-profiling (m) 178


Rishworth

Grip/Gully Blocking - Stone (Dam unit) 32

Grip/Gully Blocking: Heather (Bale) 82

Grip/Gully Blocking: Peat Dam (units) 298

Molinia Cutting (ha) 16.5

Re-profiling (m) 84

Bunding (ha) 26.35

Heather brash (bags) 33

Initial lime, seed and fertiliser (ha) 0.23

Maintenance lime and fertiliser 0.16

Standard Sphagnum planting (@1250 per ha) (ha) 54

Sedge/dwarf shrub Plug plants (@2,500 per ha) (ha) 28


Turley Holes

Peat Bunding (ha) 1.905

Grip/Gully Blocking: Peat Dam (Dam unit) 132

Grip/Gully Blocking: Heather (Bale) 468

Grip/Gully Blocking: Stone (Dam unit) 29

Re-profiling (m) 281


Snailsden whole works site package

Description/lot 7 quantites/lot 7a quantities

Brash (Bags)/ -/ 963

Lime, Seed & Fertiliser (ha)/ -/ 4.75

Year 2 Lime and Fertiliser (ha)/ -/ 4.75

Seed into sward (ha)/ -/ 3.35

Seed onto bare peat (ha)/ -/ 0.02

Bunding (ha)/ 10.32/ -

Re-profiling (m)/ -/ 23,339

Pool mix Sphagnum into existing pools

(@8000 per ha) (ha)/ -/ 0.72

Sphagnum planting

(@1250 per ha) (ha)/ -/ 398.4

Sedge/dwarf shrub Plug plants for Brash (@10,000 per ha) (ha)/ -/ 4.72

Sedge/dwarf shrub Plug plants (dry mix)

(@2,500 per ha) (ha)/ -/ 23.18

Sedge/dwarf shrub Plug plants (wet mix)

(@2,500 per ha) (ha) /-/ 0.08

Grip/Gully Blocking: Coir Logs (Coir logs)/ -/ 122

Grip/Gully Blocking: Peat (Dam)/ 1961/ 654

Grip/Gully Blocking: Timber (Dam)/ 81/ 326

Grip/Gully Blocking: Stone (Dam)/ 362/ 1449

Heather Cutting (ha)/ -/ Up to 23 ha


Pikenaze whole Site Works Package

Geotextile (m2) 21,482

Lime, Seed & Fertiliser (ha) 2.20

Year 2 Lime and Fertiliser (ha) 2.20

Re-profiling (m) 12,259

Sedge/dwarf shrub Plug plants for Geotextile (@10,000 per ha) (ha) 2.15

Gully Blocking: Stone (Dam Units) 122

(91.5 tonnes, at 94 locations)

Download full details as .pdf