The work consists of extending the heating network of the Couronneries including civil engineering works as well as the storage, handling and installation of the piping for the following antenna:
- Gibauderie connection to Crous.
Realization of the extension of the heating network with a length between 500 and 2000 linear meters of trenches in DN between 100 and 250.
Work to be carried out between the end of November 2020 and the end of August 2021.