Heating engineering work in the extension — new building consisting of the connection to an existing district heating station, 38 plates or tube radiators, approx. 600 metres of steel pipe DN 15-DN 50, as well as accessories such as pumps, valves and heat meters.
Heating engineering work in the extension — new building consisting of the connection to an existing district heating station, 38 plates or tube radiators, approx. 600 metres of steel pipe DN 15-DN 50, as well as accessories such as pumps, valves and heat meters.