Installation of an I&C switchgear for primary school and sports hall (place of assembly)
Installation of an I&C switchgear for primary school and sports hall (place of assembly)
- 2 central information focal points in the technical center (1x HVAC technology, 1x heating technology), each with its own controller, automation station, touch panel - PC's
- Approx. 340 field devices (incl. individual room control via room sensors + FBH actuators)
- Approx. 400 hardware/physical data points
- approx. 11,500 m cabling