The subject of this tender is electrical work for light rail stations in Bielefeld.
moBiel GmbH is planning the reconstruction of the main road in Bielefeld-Brackwede in the section northwest of Gaswerkstraße and south of Jenaer Straße over a length of approx. 1250m. The reconstruction essentially includes the construction of three elevated platforms (Gaswerkstraße, Normannenstraße and Brackwede Church) to achieve barrier-free access and the adaptation of the light rail tracks for the future generation of vehicles. At the same time, this will be combined with the reorganization of bicycle traffic, the renovation of the roadway, the bus stops and the renovation of the side rooms.
The subject of these tender documents is the electrical work for the above-mentioned light rail stops.
The entire measure will be carried out between April 2023 and December 2024. It is divided into 9 construction phases. The electrical work is planned in construction phases 4, 5 and 7c. This means that the electrical work can be started from the beginning of 2024.