This service specification includes the services for the redesign of the outdoor facilities in the B03 Ahrpromenade area for the following sections:
- A6 Kastanienallee along parking deck Felix-Rütten-Straße
- A8 Ahrpromenade Lindenstrasse
- B5 Ahrpromenade Georg-Kreuzberg-Straße
Landscaping and road construction work must be carried out for the manufacture of the outdoor facilities.
A6 Kastanienallee along parking deck Felix-Rütten-Straße:
- loosen 50 m³ topsoil,
- 75 m³ excavated soil,
- 400 m
- 850 m
- 130 m
- 34 m
- Break off and dispose of the 120 m border of the runner line
- Break off 17 m of edging concrete curb and dispose of it,
- Break off 45 m³ of surface / base layers made of unbound building material mixtures
- Remove 6 cast iron / wood bench seats and transport them to the depot AG,
- Remove 4 waste bins and transport them to the AG depot
- Remove 1 mast light and transport it to the depot AG,
- 120 m
- 40 m
- Create 91 m of edging from 10/10/10 cm runners,
- Make 48 m of edging from steel strip 6/100 mm
- Pick up 6 seats from the depot AG and install them
- Delivery and installation of 12 grating 500 x 1,000 mm
- Pick up and install 2 rubbish bins from the depot AG,
- 1 300 m
- Deliver and plant 459 pcs of shrubs including completion maintenance by 02/28/2022.
A8 Ahrpromenade Lindenstrasse:
- loosen 40 m³ topsoil,
- 35 m³ excavated soil,
- 250 m
- 30 m
- 20 m
- Break off and dispose of the 45 m border of the runner line
- Break off 20 m³ of surface / base layers made of unbound building material mixtures,
- Remove 4 cast iron / wood bench seats and transport them to the depot AG,
- Remove 3 waste bins and transport them to the depot AG,
- 15 m
- 14 m
- 30 m
- Make 8 m edging from a 10/10/10 cm runner line
- make 25 m of edging from steel strip 6/100 mm,
- Pick up 4 bench seats from the depot AG and install them,
- Deliver and install 4 pieces of grating 500 x 1 550 mm,
- Pick up 3 trash cans from the depot AG and install them
- 250 m
- Deliver and plant 60 bushes including completion maintenance by 02/28/2022.
B5 Ahrpromenade Georg-Kreuzberg-Straße:
- 50 m³ excavated soil,
- 540 m
- make 350 m of edging from steel strip 6/100 mm
- Pick up 4 bench seats from the depot AG and install them,
- Deliver and install 20 pieces of grating 500 x 1,000 mm,
- Pick up 4 rubbish bins from the depot AG and install them
- 1 800 m
- 57 pcs of tall trunks supplied by the customer including completion maintenance until 28.2.2022,
- Deliver and plant 190 pcs of shrubs including completion maintenance by 02/28/2022.