The target of the procurement is the unidentified new construction and renovation planning services of the municipality of Muhos.
The projects covered by the framework agreement mainly consist of repairs, maintenance and alterations to existing buildings. The framework agreement may also include new construction projects.
Based on the tendering process, a maximum of five (5) framework contract operators will be selected for each subdivision, divided as follows:
1. Main and architectural design
2. HVAC design
3. Electrical design
4. Rakennesuunnittelu
A framework agreement will be concluded with each selected framework contract operator, the details of which can be found in the attached draft framework agreement.
Main and architectural designThe target of the procurement is unidentified architectural design services for new and renovation construction in the municipality of Muhos.
The projects covered by the framework agreement mainly consist of repairs, maintenance and alterations to existing buildings. The framework agreement may also include new construction projects.
A maximum of five (5) framework contract operators will be selected on the basis of a competitive tendering procedure in accordance with the selection criteria set out in the invitation to tender.
A framework agreement will be concluded with each selected framework contract operator, the details of which can be found in the attached draft framework agreement.
The Client reserves the right to decide which assignments will be procured on the basis of the framework agreement and which will be procured separately by other procedure.
HVAC designThe target of the procurement is the unidentified HVAC design services for new and renovation construction in the municipality of Muhos.
The projects covered by the framework agreement mainly consist of repairs, maintenance and alterations to existing buildings. The framework agreement may also include new construction projects.
A maximum of five (5) framework contract operators will be selected on the basis of a competitive tendering procedure in accordance with the selection criteria set out in the invitation to tender.
A framework agreement will be concluded with each selected framework contract operator, the details of which can be found in the attached draft framework agreement.
The Client reserves the right to decide which assignments will be procured on the basis of the framework agreement and which will be procured separately by other procedure.
Electrical engineeringThe target of the procurement is unidentified electrical design services for new construction and renovation in the municipality of Muhos.
The projects covered by the framework agreement mainly consist of repairs, maintenance and alterations to existing buildings. The framework agreement may also include new construction projects.
Based on the invitation to tender, a maximum of five (5) framework contract operators will be selected in accordance with the selection criteria set out in the invitation to tender.
A framework agreement will be concluded with each selected framework contract operator, the details of which can be found in the attached draft framework agreement.
The Client reserves the right to decide which assignments will be procured on the basis of the framework agreement and which will be procured separately by other procedure.
Structural designThe target of the procurement is unidentified structural design services for new construction and renovation in the municipality of Muhos.
The projects covered by the framework agreement mainly consist of repairs, maintenance and alterations to existing buildings. The framework agreement may also include new construction projects.
A maximum of five (5) framework contract operators will be selected on the basis of a competitive tendering procedure in accordance with the selection criteria set out in the invitation to tender.
A framework agreement will be concluded with each selected framework contract operator, the details of which can be found in the attached draft framework agreement.
The Client reserves the right to decide which assignments will be procured on the basis of the framework agreement and which will be procured separately by other procedure.