The extension works of the heating network "COURONNERIES" in the municipality of Poitiers mainly include studies, preparation, supply of equipment, earthworks and installation of networks and connections as well as the repair of coatings.
The work concerns 1 km of trench to be carried out over a period of 3 months for the firm section, 100m of trench for the optional tranche 1 to be carried out in 2 weeks and 300m of trench to be carried out over a period of 1 month for the optional tranche 2
The contract is divided into tranches: a firm tranche (main feeder) and two optional tranches (relating to other antennas) defined later in the companies' consultation file.
Supply of pre-insulated pipesSupply of pre-insulated pipes
Earthworks rue du Faubourg du Pont-NeufEarthworks rue du Faubourg du Pont-Neuf
Installation of pre-insulated tubes rue du Faubourg du Pont-NeufInstallation of pre-insulated tubes rue du Faubourg du Pont-Neuf
Realization of the support and installation of pre-insulated corbelled tubes of the Pont-NeufRealization of the support and installation of pre-insulated corbelled tubes of the Pont-Neuf