STIC Strausberg - TP-5 New Office Building
Garzauer Chaussee 1a, 15344 Strausberg
Lot 02 - Structural and carpentry work
This project is funded by
Funds from the Federal Government and the State of Brandenburg within the framework of the joint task:
"Improvement of regional economic infrastructure" - GRW infrastructure.
- Construction site equipment incl. construction management office 1 piece/ sanitary container 2 pieces
- Earthworks, such as clearing the construction site and excavating the excavation pit
- Earthworks, such as underground pipes / house connection electrical / TW / waste water / district heating incl. line trenches
- approx. 800 m2 foundation, floor slab incl. shaft pit on cleanliness layer incl. sealing work and earthing system
-approx. 210 m2 ceiling slab reinforced concrete, thickness 35 cm, soffit SB 3
-approx. 1025 m2 ceiling slab reinforced concrete, thickness 20 cm, soffit partly SB 2
-approx. 370 m beam nose (ceiling) reinforced concrete, 12/40 cm
-approx. 90 m beam nose (ceiling) reinforced concrete, 12/18 cm
-approx. 40 m lintel reinforced concrete, 60/ 20 cm
-approx. 85 m in-situ concrete columns, round, smooth, SiB SB 2, diameter 30 cm
-approx. 100 m in-situ concrete columns, round, smooth, SiB SB 2, diameter 25 cm
-approx. 35 m in-situ concrete columns, angular, smooth, SiB SB 2, diameter 28/28 cm
-approx. 320 m in-situ concrete columns, angular, smooth, SiB SB 2, diameter 25/25 cm
-approx. 310 m2 outer wall as load-bearing shell, reinforced concrete, smooth inside, thickness 20 cm
-approx. 1379 m2 interior wall, reinforced concrete, partly. SiB SB 2, thickness 20 cm
-approx. 33 m2 interior wall, reinforced concrete, partly. SiB SB 2, thickness 25 cm (wall-like support)
- 1 piece elevator shaft made of reinforced concrete, ground floor to 3rd floor, shaft dimensions L/W/H i.L approx. 1.775/2.64/15.73 m
- approx. 164 m2 attic, reinforced concrete, thickness 18 cm
- approx. 26 m2 curb (outer wall) for round skylight in the atrium, SiB SB 2, d=15cm
- 12 prefabricated stair flights of 10 climbs each, straight, gradients approx. 17.5/30, Stb./SiB SB 2 incl. platforms
- approx. 760 m beams as semi-precast concrete elements in various dimensions, SiB SB 2
- approx. 456 m precast concrete façade elements made of recycled concrete, W x H 19x33 cm incl. fastening anchor
- approx. 100 m2 prefabricated façade elements, 2-layer, SiB SB 3, thickness 19 cm incl. door openings, joints, ornament