Safety fencing | Tenderlake

Safety fencing

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 September 2023
Closing Date:
30 October 2023
Location(s):
FR FRANCE
Description:

INSTALLATION OF ZPN FENCES AROUND THE PEGASE CASCAD INSTALLATIONS OF THE CADARACHE SITE


The purpose of the contract is studies (implantation, sizing, connection, integration into the existing, ...) the supply, installation and commissioning of the following equipment:

- A fence with anti-climbing characteristics (mesh welded with a fine mesh) and equipped with flaps;

In order to optimize implementation times and take into account operating constraints, the method of laying the ZPN fence will have to be adapted according to the area. As such, the fence will be placed on:

- GBA type studs (PEGASE side (Red colored track)) on a linear estimated at about 250 meters. This solution facilitates the processing of all networks likely to cross the fence route;

- A concrete footing or GBA for the remaining portion estimated at about 230 meters less impacted by the presence of networks. Bidders will have to detail and justify their choice on this part of the route, in particular on the cost, time and sustainability aspects of the solution

- Instrumentation on the fence to detect an attempt to cross the ZPN boundary;

- A set of cameras associated with lighting to monitor the entire ZPN;

- Openings (Rotary Safety Drums, gates and motorized gate) allowing the crossing of the ZPN barrier for authorized persons and vehicles;

- The access control equipment associated with the openings.

The contract is a Defence or Security Contract (MDS) as defined in Article L1113-1 of the Public Order Code paragraph 2: the supply of equipment intended for security and which involves, requires or contains protected or classified media or information in the interest of national security.

II.1.5) Brief description of the contract or acquisition(s):

BRIEF DESCRIPTION

The object of the contract is studies (siting, sizing, connection, integration into the existing one, ...) the supply, installation and commissioning of the following equipment:

- A fence with anti-climbing characteristics (mesh welded with a fine mesh) and equipped with flaps;

In order to optimize implementation times and take into account operating constraints, the method of laying the ZPN fence will have to be adapted according to the area. As such, the fence will be placed on:

- GBA type studs (PEGASE side (Red colored track)) on a linear estimated at about 250 meters. This solution facilitates the processing of all networks likely to cross the fence route;

- A concrete footing or GBA for the remaining portion estimated at about 230 meters less impacted by the presence of networks. Bidders will have to detail and justify their choice on this part of the route, in particular on the cost, time and sustainability aspects of the solution

- Instrumentation on the fence to detect an attempt to cross the ZPN boundary;

- A set of cameras associated with lighting to monitor the entire ZPN;

- Openings (Rotary Safety Drums, gates and motorized gate) allowing the crossing of the ZPN barrier for authorized persons and vehicles;

- The access control equipment associated with the openings.

The contract is a Defence or Security Contract (MDS) as defined in Article L1113-1 of the Public Order Code paragraph 2: the supply of equipment intended for security and which involves, requires or contains protected or classified media or information in the interest of national security.

DESCRIPTION OF SERVICES

The contract is broken down as follows:

- Firm and flat-rate share

- Estimated share

o Estimated share on slip of unit price (BPU)

o Estimated share on prior estimate (FDMDP)

The fixed firm share includes siting and execution studies as well as work for the following items and sub-items:

1. Installation Base life

1.1. Living area: Supply and installation

1.2. Living area: File

1.3. Storage area: Supply and installation

1.4. Storage area: Drops

2. Fence with flap + impact cable

2.1. GC/VRD for installation on concrete footings

2.2. GC/VRD for laying on GBA

2.3. Double panes

2.4. Anti-escalation fence panel (installation on GBA)

2.5. Fence posts (installation on GBA)

2.6. Anti-climbing fence panel (installation on concrete footing)

2.7. Fence posts (installation on concrete footing)

2.8. Supply and installation of detection equipment (impact cable)

2.9. Centralized management devices for detection

2.10. Installation of the boxes

2.11. Networks sec

2.12. Cabling and connection

3. Fence intervention lighting

3.1. Luminaire

3.2. Installation of the

3.3. Front-end installation

3.4. Installation on mat

3.5. Dry networks

3.6. Installation of enclosures

3.7. Cabling and connection

4. Particular traversal detective

4.1. Mechanical protection

4.2. Detection

4.3. Centralized management devices for detection

4.4. Installation of enclosures

4.5. Networks sec

4.6. Cabling and connection

5. Passive particular traversal

5.1. GC/VRD

5.2. Mechanical protection

6. Mat Video

6.1. GC/VRD

6.2. Mats

7. Video surveillance fence

7.1. FIXED CAMERA

7.2. PTZ camera

7.3. Front-end installation

7.4. Installation on mat

7.5. Rack

7.6. Installation of enclosures

7.7. Dry networks

7.8. Cabling and connection

8. Pedestrian control area

8.1. GC/VRD

8.2. TRS

8.3. Gate

8.4. Phone

8.5. CARECE

8.6. Access control management appliances

8.7. Installation of enclosures

8.8. Networks sec

8.9. Cabling and connection

9. Pedestrian area lighting

9.1. Luminaire

9.2. Installation of enclosures

9.3. Dry networks

9.4. Cabling and connection

10. Video surveillance Pedestrian area

10.1. FIXED CAMERA

10.2. PTZ camera

10.3. Front-end installation

10.4. Installation on mat

10.5. Rack

10.6. Installation of enclosures

10.7. Dry networks

10.8. Cabling and connection

11. Vehicle control area

11.1. GC/VRD

11.2. Portal

11.3. Portal motorization

11.4. Portal control box

11.5. Gate

11.6. Phone

11.7. CARECE

11.8. Access Control Management Appliances

11.9. Installation of the set up

11.10. Networks sec

11.11. Cabling and connection

12. Vehicle area lighting

12.1. Luminaire

12.2. Installation of enclosures

12.3. Dry networks

12.4. Cabling and connection

13. Video surveillance Vehicle area

13.1. FIXED CAMERA

13.2. PTZ camera

13.3. Front-end installation

13.4. Installation on mat

13.5. Rack

13.6. Installation of enclosures

13.7. Dry networks

13.8. Cabling and connection

14. Networks

14.1. Rainwater treatment

14.2. Connecting to CFA

14.3. Connection to CFO

15. Layout of the technical room

15.1. Remote alarm infrastructure

15.2. Infrastructure fence

15.3. Video framework

15.4. Access Control Infrastructure

15.5. Power supply and distribution

16. Reporting information and systems in installation

16.1. Implementation of the closing post

16.2. Video report

17. Documents

17.1. Appropriation Note of the Technical Specification of Need and Compliance Matrix

17.2. Hydrological studies of the site taking into account all the modifications made by the operation

17.3. Definition Justification File (DJD)

17.4. Interface Identification and Management File (DIGI)

17.5. Site Management File (CMD)

17.6. Site safety files

17.7. Planning Note

17.8. Configuration Summary Report

17.9. Cost Estimate Note

17.10. Operating Cost Estimate Note

17.11. General Test Plan

17.12. Operator training plan

17.13. Set of deliverables for closing

17.14. Set of deliverables for closure detection

17.15. Set of deliverables for access control

17.16. All deliverables for video surveillance

17.17. Set of deliverables for remote alarm

17.18. All deliverables for electrical distribution

17.19. All deliverables for the layout of the technical room

18. Test and test

19. Licenses

Estimated share on BPU

The additional services on the unit price schedule (BPU) concern:

drillings in subsection 4 in the following areas:

• in the technical rooms of the installations;

• on the front of buildings

• on asphalt (paved roads and car parks)

adjustments to quantities related to fences, power supplies, installation of masts or cameras, network equipment

Estimated Share on Pre-Estimate (FDMDP)

For the consideration of contingencies;

In the circumstances set out in Article 7.2 of the Contract.

Download full details as .pdf
The Buyer:
CEA Centre de CADARACHE
CPV Code(s):
34928310 - Safety fencing
45340000 - Fencing, railing and safety equipment installation work