Water installations | Tenderlake

Water installations

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
25 February 2022
Closing Date:
24 March 2022
Location(s):
FR FRANCE
FR1 ÎLE DE FRANCE (FR FRANCE)
FRB CENTRE – VAL DE LOIRE (FR FRANCE)
FRB0 Centre – Val de Loire (FR FRANCE)
FRC BOURGOGNE-FRANCHE-COMTÉ (FR FRANCE)
FRC1 Bourgogne (FR FRANCE)
FRC2 Franche-Comté (FR FRANCE)
FRD NORMANDIE (FR FRANCE)
FRD1 Basse-Normandie (FR FRANCE)
FRD2 Haute-Normandie (FR FRANCE)
FRE NORD-PAS DE CALAIS-PICARDIE (FR FRANCE)
FRE1 Nord-Pas de Calais (FR FRANCE)
FRE2 Picardie (FR FRANCE)
FRF ALSACE-CHAMPAGNE-ARDENNE-LORRAINE (FR FRANCE)
FRF1 Alsace (FR FRANCE)
FRF2 Champagne-Ardenne (FR FRANCE)
FRF3 Lorraine (FR FRANCE)
FRG PAYS DE LA LOIRE (FR FRANCE)
FRG0 Pays de la Loire (FR FRANCE)
FRH BRETAGNE (FR FRANCE)
FRH0 Bretagne (FR FRANCE)
FRI AQUITAINE-LIMOUSIN-POITOU-CHARENTES (FR FRANCE)
FRI1 Aquitaine (FR FRANCE)
FRI2 Limousin (FR FRANCE)
FRI3 Poitou - Charentes (FR FRANCE)
FRJ LANGUEDOC-ROUSSILLON-MIDI-PYRÉNÉES (FR FRANCE)
FRJ1 Languedoc-Roussillon (FR FRANCE)
FRJ2 Midi-Pyrénées (FR FRANCE)
FRK AUVERGNE-RHÔNE-ALPES (FR FRANCE)
FRK1 Auvergne (FR FRANCE)
FRK2 Rhône-Alpes (FR FRANCE)
FRL PROVENCE-ALPES-CÔTE D’AZUR (FR FRANCE)
FRL0 Provence-Alpes-Côte d’Azur (FR FRANCE)
Description:
Installation and maintenance of “tank” and “network” fountains for the EDF Group

Installation, maintenance and maintenance services of water bottle fountains and water fountains on the network of the company's tertiary and industrial sites.

All of EDF's sites and its subsidiaries are divided into several regional lots.

All ENEDIS sites are divided into several regional lots.

Installation and maintenance of fountains on the network of EDF sites and subsidiaries for the Ile-de-France Region

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 362 units.

Installation and maintenance of fountains on the network of ENEDIS sites for the North-East zone

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 304 units.

Installation and maintenance of fountains on the network of EDF sites and subsidiaries for the Grand Ouest Sud zone

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 490 units.

Installation and maintenance of fountains on the network of EDF sites and subsidiaries for the Grand Ouest Nord zone

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 484 units.

Installation and maintenance of fountains on the network of EDF sites and subsidiaries for the South-East zone

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 634 units.

Installation and maintenance of fountains on the network of EDF sites and subsidiaries for the North-East zone

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 304 units.

Installation and maintenance of bottle fountains on EDF sites and subsidiaries in the national territory

The services to be performed are:

• Provide one or more bottle fountain (s) in perfect working order;

• Install each bottle fountain on the site (s) and in the place (s) defined in consultation with the representative of the Company (in particular the transport, connection and commissioning of the equipment) close to an electrical outlet, up to a distance of 2m maximum, If necessary over a distance of more than 2m for electricity, Company will take over the work and the financing of the additional distance.

• Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

• Deliver consumables ordered by the Company to a location specified by the latter.

• Remove at the end of the contract according to the schedule communicated by the Company.

• Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 383 units.

Installation and maintenance of fountains on the network of ENEDIS sites for the Ile-de-France Region

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 250 units.

Installation and maintenance of fountains on the network of ENEDIS sites for the South-East zone

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 580 units.

Installation and maintenance of fountains on the network of ENEDIS sites for the Grand Ouest zone

The services to be performed are:

o Provide one or more “direct draft” water fountain (s) (water cooled directly by a coil cooled by a compressor) in perfect working order;

o Install each water fountain on the site (s) and at the place (s) defined in consultation with the representative of the Company (including transport, connection and commissioning of equipment) close to a water supply or up to a distance of 3 meters maximum, close to an electrical outlet, up to a distance of 2m maximum, and, in case of connection to mains drainage, close to a suitable drain, up to a distance of 1m. If necessary over a distance greater than 2m for electricity or 3 meters for access to water, the Company will take care of the work and the financing of the additional distance.

o Maintain and/or carry out the manipulations necessary for the permanent proper functioning of the water fountain (s), and the maintenance of the bacteriological quality in accordance with the Hygiene and Sanitary regulations in force;

o Deliver consumables ordered by the Company to a location specified by the latter.

o Remove fountains at the end of the market according to the schedule communicated by the Company.

o Remove water fountains during the market on request of the Company.

The volume of the fountains included in this lot is approximately 340 units.

Download full details as .pdf
The Buyer:
EDF SA - Direction des Achats Groupe - DOA TPIT
CPV Code(s):
39370000 - Water installations