Repair of concrete in the loading basin of the Fontpédrouse plant in the commune of Fontpédrouse.
Site visit to be scheduled for September 21 and 22, 2023.
1. Studies, installation of the site and evacuation
- Mission of preliminary measurements and surveys, Execution studies, Drafting of procedures and methods, Quality Assurance Plan (QAP)
- Installation and withdrawal of site Including the supply of all the materials necessary for the site, their supply and any possible recovery, the storage in good conditions of materials and materials, maintenance, paneling and public indications including the implementation of devices related to hygiene Covid 19 ... , the environment (waste treatment) and safety, Access Tagging
- Creation of the construction area and preparatory work including, De-silting / cleaning of the basin, diversion of water inlets
- Executed Works File (DOE)
2. Concrete reconstruction
- Preparation of supports up to 5 cm deep ( M² ) Wet projection of repair mortar Fiber (plaster)
- Added value per additional 5 cm depth ( M² )Wet projection of concrete mortar (M²)
- Preparation and repair of the raft 20cm deep (M²)
- Added value works in Height crest of the spillway ( M² )
3. Optional tranche
- Supply and mechanical fixing of a polypropylene mesh (M²)