Due to its useful life, the existing school building is in a condition that requires extensive repair. It is planned
to leave the supporting structure in place. Reference is made to the feasibility study regarding the remediation measures.
The space requirement of the renovated school is being met in accordance with the currently changed room program G9 for grammar schools and is the
feasibility study. It attaches great importance to economic and energy-efficient planning.
The appearance of the school building must be adapted to the sports hall, which was renovated in 2018. The implementation of
Renovation measures are to be carried out in a construction phase. For this purpose, it is necessary that the school operation is completely rebuilt into a
outdoor sports facilities container school to be built is outsourced. For this purpose, the services of structural planning according to §§ 49 et seq. HOAI 2021 are to be awarded for service phases 1 to 8.
Due to its useful life, the existing school building is in a condition that requires extensive repair. It is planned
to leave the supporting structure in place. Reference is made to the feasibility study regarding the remediation measures.
The space requirement of the renovated school is being met in accordance with the currently changed room program G9 for grammar schools and is the
feasibility study. It attaches great importance to economic and energy-efficient planning.
The appearance of the school building must be adapted to the sports hall, which was renovated in 2018. The implementation of
Renovation measures are to be carried out in a construction phase. For this purpose, it is necessary that the school operation is completely rebuilt into a
outdoor sports facilities container school to be built is outsourced. For this purpose, the services of structural planning according to §§ 49 et seq. HOAI 2021 are to be awarded for service phases 1 to 8.