Electrical wiring and fitting work | Tenderlake

Electrical wiring and fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
15 September 2023
Closing Date:
17 October 2023
Location(s):
DE403 Frankfurt (Oder), Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
JG 1 - 41, 3.BA Lot 402a Electrical installation

From 2022 to 2024, Wohnungswirtschaft Frankfurt (Oder) GmbH is comprehensively renovating the Juri-Gagarin-Ring 1 - 41 residential complex. The area Juri-Gagarin-Ring 1 - 41 was built in 1970 using the industrial construction method (IW 66/P2-5 storey). All seven residential buildings have a basement, 5 upper floors and a mezzanine. In each staircase there are 10 apartments (two-in-hand). A total of 359 apartments are to be renovated over the three construction phases.

The services of the 3rd construction phase include the buildings Yuri Gagarin Ring 1 - 4; 5 - 9 and 10 - 14 with a total of 129 apartments after renovation.

The renovation work will be advertised in 23 lots:

Lot 301 Baustraße

Lot 302 Construction site installation

Lot 303 Crane operated dismantling

Lot 304 demolition and coring work

Lot 305 Scaffolding

Lot 306 Shell construction and plastering work

Lot 307 Civil engineering work and outdoor facilities

Lot 308 EIFS and façade

Lot 309 Roofing and covering services

Lot 310 plastic windows

Lot 311 aluminum elements

Lot 312 Balconies/entrance stems

Lot 313 Basement ceiling and dremple insulation

Lot 314 Interior, functional and cellar doors

Lot 315 Drywall works

Lot 316 screed work

Lot 317 Painting works

Lot 318 Flooring work

Lot 319 tiling work

Lot 320 final cleaning

Lot 321 Balcony renovation (3rd BA only)

Lot 401 Heating - ventilation - sanitary

Lot 402 Electrical Work

Lot 403 Elevator systems

This tender includes only Lot 402a - Electrical installation for the buildings J.-Gagarin-Ring 5; 6 - 9 and 10 - 14! The renovation work for lot 402b, which includes the building J.-Gagarin-Ring 1 - 4, will be put out to tender separately at a later date.

During the entire construction period, the apartments are mostly occupied!

The staircase at Yuri Gagarin Ring 5 has been vacated due to planned changes to the floor plan.

Electrical installation

In the staircases JG 6 - 9 and 10 - 14, the house connection, main pipes, meters, risers and the apartment distribution are to be completely renewed, expanded or strengthened. In this case, all electrical meters of a staircase (including apartment meters) are centralized in a basement room of the staircase. In each of the 90 apartments, the housing sub-distribution will be renewed. In the bathroom, the complete electrical installation and in the kitchen at least the electrical installation in the kitchenette area will be renewed. The installations are mostly plastered, in the bathroom partly under plaster. In the inhabited apartments, the circuits of all other rooms remain in their current state, they are only clamped into the new apartment sub-distribution. All inhabited apartments will receive a new electric stove with ceramic hob. In the empty apartments, the entire electrical installation in all rooms will be renewed.

The entire lighting of the stairwell will be renewed.

Work must continue to be carried out on lightning protection. Smoke exhaust systems and elevator systems provided by the customer must be wired in accordance with the manufacturer's instructions.

In the staircase J.-Gagarin-Ring 5, the floor plans are changed. Here, the entire electrical installation of the staircase including the house connection is renewed.

Download full details as .pdf
The Buyer:
Wohnungswirtschaft Frankfurt (Oder) GmbH
CPV Code(s):
45311000 - Electrical wiring and fitting work
45311200 - Electrical fitting work